![]() | Krzysztof Knop ELIMINATION OF CONSTRAINTS IN THE PRODUCTION PROCESS OF POWER EQUIPMENT COMPONENTS AND THE ANALYSIS OF THE RESULTING BENEFITS PRODUCTION ENGINEERING ARCHIVES 24(2019), pp. 37-42 DOI: 10.30657/pea.2019.24.09 | |
Abstract The article presents the results regarding the elimination of constraints in the production process of a power equipment subassembly, a boiler chamber, together with an analysis of the benefits resulting from this, both financial and non-financial. The significance of bottlenecks in the production process, ways of its identification and limitations - in general - are presented. The article is a case-study of an attempt to eliminate the bottleneck in the production process of the boiler chamber, which turned out to be the process of drilling and marking-off, and work stations representing these processes. In order to eliminate the limitation, it was decided to replace the existing tracing and drilling work with a numeri-cally controlled device - a boring machine moved from the liquidated department.. As a result, labor-intensive, manual chambers marking-off and the process of drilling holes with a smaller diameter drill have been eliminated. A number of benefits has been demonstrated resulting from the elimination of the bottleneck in the process, first of all, it was possible to reduce the duration of the marking-off and drilling operations and reduce the costs of the boiler chamber production process. | ||
Keywords constraints bottlenecks energy industry elimination benefits costs | ||
Krzysztof Knop ORCID ID: https://orcid.org/0000-0003-0842-9584