Marek Krynke, Krzysztof Knop, Krzysztof Mielczarek
USING OVERALL EQUIPMENT EFFECTIVENESS INDICATOR TO MEASURE THE LEVEL OF PLANNED PRODUCTION TIME USAGE OF SEWING MACHINE
PRODUCTION ENGINEERING ARCHIVES 5/4(2014), pp. 6-9

Abstract
The chapter presents the results of utilization of the OEE indicator to measure the level of operating time usage of sewing machine production of air bags. The idea of an OEE indictor, which is a key metrics in Total Productive Maintenance (TPM) program, is presented. The goals and benefits of its calculation are included. The research object – KL 110 air bags sewing machine - what for the machine is used. The calculation of TPM indicators for the analysed machine is presented. The calculation of TPM indicators was undertaken over a period of six months of the machine’s working time. It was indicated that the overall effectiveness of the machine is at a level of 65,7%, the time loss-es were 34,3%. Most of the losses were related to low performance. Only Availability indicator reaches a word class level, if other indicators such as Performance, Quality and OEE should be improved, their value should be increased. Activities to improve the effectiveness of the machine utilization were determined.



Keywords
air bags sewing machine
TPM
OEE
improvement