![]() | Piotr Sygut EVALUATION OF PAVING STONE PRODUCTION QUALITY PRODUCTION ENGINEERING ARCHIVES 6/1(2015), pp. 14-16 DOI: 10.30657/pea.2015.06.04 | |
Abstract The results of tests carried out for the company involved in the production of paving stones. The study used the Pareto-Lorenz diagram. After analyzing the production process 10 discrepancies were identified. The Pareto-Lorenz diagram shows that the highest value is cumulative deficiency "uneven concrete mix to fill the form on the structural layer and a top." The results indicate that another cause of incompatibilities in terms of the cumulative value is the "poorly chosen concrete mix". | ||
Keywords paving stones Pareto-Lorenz diagram quality evaluation | ||
Piotr Sygut ORCID:0000-0002-7306-3390
